Resident Engineer for demolition and reconstruction of the historic, 150-foot long, stone retaining wall, Construction included installation of a temporary excavation support system consisting of soldier piles, timber lagging and grouted tendon tiebacks. Project work also included installing approximately 48-inch trunk water main and 12-inch diameter ductile iron pipe. The project also featured a full roadway reconstruction, roadway resurfacing, and installation of new curbs and sidewalks, street lighting, tree planting, landscaping, and installation of a green street.
Reconstruction of Bailey Ave Retaining Wall & Trunk Water Main
- Owner: NYC Department of Design and Construction
- Cost: $5.4 million
- Date: 2012-2014
- Location : Bronx, NY